LP Water

New Method
New equipment
New Customers
for Your Business

Any well can be treated within a couple of hours

Flow Industries Pinwheel

Unprecedented innovation

Bring unprecedented innovation to the drilling and service water well business

well maintenance

Safe

Safe, environmentally friendly

After AirShock Treatement

Highly effective

Highly effective for both screened and open wells

Time-saving

well can be treated within a few hours

Easy to use

may be used independently or in combination with chemicals

The AirShock® Water Well Rehab Process

The process involves creation of a shock wave and oscillating gas bubble after each pulse resulted in removing hardened scale and biological build-up from the screen, gravel pack and surrounding area. The shock wave breaks up the scale on the screen, while the expanding and contracting bubble forces water in and out of the gravel pack and aquifer ensuring a comprehensive washing process. In a very short time, a well is completely restored to the original level of efficiency. The method is unique both in success and ease of setup and operation

What our customers say

I am pleased, not only with the results we have achieved with AirShock, but how easy it is to setup and apply.
Three wells were returned to 90+% of original capacity and one, a sandstone well, came back to 141% of original. The two relief wells in the St. Louis District responded favorably with gains of 12 and 81% over previous treatments with modest amounts of chemicals and without damage to the PVC casing, which was a major concern.

Roger D. Miller
Technical Director, Layne Christensen, Inc., USA
We got incredible results with AirShock. We increased the specific flow for about 400%. The client is very happy.
They where pumping 30 lps @ 70m. At the end of the pumping test we were pumping 74 lps @ 42m

Jerónimo von Wuthenau Mayer
Mtro. Ing, Equipozo, Mexico
This new well had a lot of silt in suspension, we were actually trying to break and loose a bridge that formed in the gravel pack during gravel pack installation. The bridge prevented the gravel from covering the screens. Everything we tried did not work and we were running out of options.
10 min of AirShocking was enough for the bridge to break, gravel is now entering the well; we are very happy. AirShock made in 10 min what traditional technics like jetting, surging and airlift could not do in 10 days, very impressive.
Thank you for developing such a good tool.

Mauricio Solis
Owner, HIDRO DRILL, Bolivia
Running AirShock as pre-fracturing and post-fracturing procedures. Results with and without AirShock are as different as day and night. With AirShock I am getting fantastic results

Chuck Claverack
Owner, Claverack Pump Service, NY, USA

Spend Less Offer More

contact us today