Partial List of Silo-Flow™ and Turbo-Flow™ Customers And Global Installations.
“I Just wanted to let you know that we had a very large snowman this morning, turned on the 'big gun' and collapsed him in about 5 minutes. We haven't used a high pressure water blaster since having your system.”
Josh Fredlake, Production Manager, Giant Cement, SC, USA
“I wanted to update you on the system. By all accounts, the system is working well. We are now to the point that the system does not need any sort of consistent manpower.”
Michael Schutt, Production Manager, Lehigh Cement, Alabama, USA
“Our main objective was to increase the production process predictability and we got this all right, but as a big bonus we got huge savings with the move to 100% synthetic gypsum. We paid back the investment in no time. ”
Yair Itzhak, General Manager, Nesher Cement, Israel